Activités

Macoba-TP
Macoba TP intervenes in various activities of the Building and Public Works with a recognized professionalism.

General Enterprise

General company We have mastered the delivery of turnkey buildings.

Public Works & Civil Engineering

General company We have mastered the delivery of turnkey buildings.

General Enterprise

General company We have mastered the delivery of turnkey buildings.

General Enterprise

General company We have mastered the delivery of turnkey buildings.

OUR ACHIEVEMENT

  • 1997 – 1999

    Kelle-Akieni road in Gabon Complete and individual realization of a 35 km stretch in the framework of a subcontract with the company NESCO (financing: Gabonese State)

  • 1998 – 2001

    Construction and rehabilitation of the pharmaco in NKTT (financing: DGI).

  • 1998 – 2000

    AL WAHDA dam works in Morocco by subcontracting with TCC (financing: Kingdom of Morocco).

  • 1999 - 2002

    Rip-rap works of the hydroelectric plant of MANANTALI Rip-rap works of the plant and maintenance of road Mahina of 80 km in subcontract with the company NESCO (financing: SOGEM - OMVS).

  • 1999

    Construction and rehabilitation of the Aleg Hospital (Financing: Ministry of Health).

  • 2000 – 2002

    Construction and development of the Lambaré-Fougamou road under contract with UNESCO (Financing: SOGEM - OMVS).

  • 2002

    Civil engineering work for the 90KV MATAM KAEDI towers and fitting out of its access parts (Financing: SOGEM).

  • 2000 – 2003

    Earthworks and part of the civil engineering for the MANANTALI hydroelectric power plant in subcontract with the company NESCO (Financing: SOGEM). Rosso station with stripping, leveling, filling and compaction of the platform, realization of internal roads (financing: SOGEM).

  • 2002 – 2003

    Energy of Manantali lot n° LB3.1 Civil engineering works for 90 kV Kaédi Bogué towers and access tracks (Funding: SOGEM).

  • 2003 - 2004

    Packing and compacting of platform for the project to secure supplies of petroleum products (15000 m3) in Nouakchott and construction of a 2.20 km shellfish TV track under contract with the INABENSA-EPTISA-DRAGAPOR-HISPANICA de CALDERERIA consortium (Financing Ministry of Energy MEPP ).

  • 2003 - 2004

    Work to strengthen and repair the right bank dike of DIAMA ROSSO and the Bell dike (between Bouhajara and Zire) of SOGED OMVS cumulative length of 135 km (Financing: SOGED).

  • 2004 – 2005

    Travaux de construction du périmètre irrigué de LEXEIBA d’une superficie de 110 ha (Financement : SONADER).

  • 2004 – 2005

    Project LEGWEICHICH construction of a fishing village on the coast opposite TIGUINT (Funding: Spanish cooperation Ministry of Fisheries).

  • 2006 – 2009

    Rehabilitation of small and medium irrigated areas of the Brakna LOT 1 (Financing: SONADER).

  • 2007

    Project Aftout Essahli - Water supply works of the city of Nouakchott, Lot 3 and 4 (Financing: BID)